Box_Logo.png

Keeyask Dam for the BBE Hydro Constructors LP


UER completed the analysis, coordination, arc flash study design, and commissioning of the High and Low voltage distribution  systems for infrastructure required to build the new hydroelectric dam. The scope of the work included data gathering, electrical system analyasis, modeling, protective deice coordination, short circuit analysis, arc flash analysis, lighting risk assessment and design, grounding design and specification, power systems design and specification, site inspections for conformance to design, and commissioning of the high and low voltage electrical distribution systems. Commissioning includes testing and operational verification of the cables, electrical devices and protective devices with respect to time response per NETA for the following facilities:


  • Fuel Farm
  • Quality Control Laboratory
  • Mechanic Shop
  • Batch Plant
  • Warehouse
  • Construction Power Distribution Batch Plant
  • Wash Bay
  • Power House Temporary Facility
  • Carpentry Building


The following deliverables were issued:


  • Batch Plant Single Line Diagram
  • Testing and Commissioning path
  • Keeyask Generation Station Electrical Equipment Testing and Commissioning Methodology
  • Batch Plant Electrical Equipment Layout and Grounding Design
  • Primary Electrical Grounding Speciation
  • Secondary Electrical Grounding Speciation
  • Electrical Grounding Details Preparation
  • Electrical Equipment Heat Loss Calculation
  • Arc Flash Analysis Report and Warning Label preparation
  • Protective Device Coordination TCC curves
  • Lightning Protection Design and Risk Calculation
  • 5MVA Transformer Primary (HV) and Secondary Cable Sizing
  • High voltage switchgear data sheet
  • High voltage switchgear installation specification
  • High voltage transformer neutral grounding Resistor (NGR) sizing
  • Cable schedule and voltage drop verification
  • Specification of lightning protection
  • Startco SE-330 relay setting file 




Taboule Lake Fuel Tank Farm


The design and build of power distribution and controls for the inclusion of 9 submersible turbine pumps delivering diesel fuel for a diesel generating facility owned and operated by Manitoba Hydro. The project lasted for six months. The following deliverables were issued:


  • Electrical Single Line Diagram update
  • Electrical Equipment Layout and Grounding Design
  • Electrical Grounding Details Preparation
  • Electrical Equipment Name plate with Lamacoids
  • Control System design and Integration into existing system
  • Installation Methodology
  • Control Panel design
  • Cable schedule, Cable Tray and voltage drop verification
  • Specification of Submersible Turbine Pump Protection
  • Classified zone study and  wire method design
  • Submersible Turbine Pump power supply design






Qulliq Energy Corporation - Repulse Bay Nunavut


Switchgear repair, Replacement and commissioning

Universal Energy Resources Inc. was contracted to preform the following:


  • Installation of cable tray
  • Cables
  • Devices
  • Switches & breakers
  • Control wiring
  • Commissioning


This Project was executed at a diesel generating facility. All work completed was extremely sensitive to operations because the facility serves a remote artic community. All execution of the work required well planned shut downs to minimize impact on the operations. The work was completed on time and the client representative expressed satisfaction in the finished product.


Defense Construction Canada, 17 Wing Winnipeg MB


Building 129 Upgrade HID lighting to LED. This project was purely construction with no design element.




..............

Past Projects