Keeyask Dam for the BBE Hydro Constructors LP
UER completed the analysis, coordination, arc flash study design, and commissioning of the High and Low voltage distribution systems for infrastructure required to build the new hydroelectric dam. The scope of the work included data gathering, electrical system analyasis, modeling, protective deice coordination, short circuit analysis, arc flash analysis, lighting risk assessment and design, grounding design and specification, power systems design and specification, site inspections for conformance to design, and commissioning of the high and low voltage electrical distribution systems. Commissioning includes testing and operational verification of the cables, electrical devices and protective devices with respect to time response per NETA for the following facilities:
The following deliverables were issued:
Taboule Lake Fuel Tank Farm
The design and build of power distribution and controls for the inclusion of 9 submersible turbine pumps delivering diesel fuel for a diesel generating facility owned and operated by Manitoba Hydro. The project lasted for six months. The following deliverables were issued:
Qulliq Energy Corporation - Repulse Bay Nunavut
Switchgear repair, Replacement and commissioning
Universal Energy Resources Inc. was contracted to preform the following:
This Project was executed at a diesel generating facility. All work completed was extremely sensitive to operations because the facility serves a remote artic community. All execution of the work required well planned shut downs to minimize impact on the operations. The work was completed on time and the client representative expressed satisfaction in the finished product.
Defense Construction Canada, 17 Wing Winnipeg MB
Building 129 Upgrade HID lighting to LED. This project was purely construction with no design element.
..............